Termite Control

PRE-CONSTRUCTION ANTI-TERMITE TREATMENT:

Chemical treatment carried out at the early stages of the building construction to prevent termite entry. Soil toxicants are applied at various stages of construction.

  1. Treatment to around the column and plinth beams
  2. Wall and floor junctions
  3. Plinth area
  4. External perimeter

This strong chemical barrier prevents termite entry into the building for a long time.

POST-CONSTRUCTION ANTI-TERMITE TREATMENT:

Treatment carried out by making a chemical barrier at the plinth level by drilling holes at the wall and floor junctions or above the skirting inside the building in all rooms and at the external perimeter.

Spraying of termiticide on all wooden fixtures in the premises. The existing termite infestation will be effectively controlled.